There are two forms commonly used in construction: rolled asphalt and mastic asphalt. Rolled asphalt (usually hot rolled or HRA) is one of the forms of road surfacing material known collectively as blacktop. It is often used in shopping malls, parking lots and driveways.
Lead times for paving a driveway can be up to several weeks, so plan appropriately when talking with your prospective paving contractors.
Asphalt paved driveways are extremely popular and the most cost-effective to install over most other driveway options. However, hiring the right asphalt-paving contractor can sometimes be a challenge. If the paving contractor installs the asphalt driveway correctly, the driveway should last 25-30 years with only minor maintenance.
To ensure a quality paved driveway, it is critical that the paving contractor first properly prepare the driveway for the Hot Mix Asphalt. Preparation includes removing topsoil or clay-type soil and replacing it with a sub-base layer of crushed stone and gravel.
Unlike concrete, an asphalt-paved driveway is both strong and flexible. A typical asphalt-paving job consists of the application of two layers of Hot Mix Asphalt over the sub-base layer. In some cases, a paving contractor may suggest a full-depth asphalt application. This type of application is best if very heavy vehicles will be regularly parked on the driveway.
In order to obtain accurate quotes from the asphalt driveway-paving contractors, it is best to have a sketch of the home and the desired driveway footprint. You should also walk the site with the paving contractor and have him or you stake or paint lines where the paved driveway is to lay. When talking to the prospective paving contractors, make sure the subject of installing proper slopes and drainage is discussed. Otherwise, you may wind up with water pooling on the finished driveway, or even worse, draining into your garage or home. It is also critical that during the installation of all the various layers to the driveway, each layer gets compacted prior to the installation of the next layer of material. Quoted depths should be after compaction, not before. Also, if there are any municipal pipes that need to be raised to the finished height of the driveway, find out if the paving contractors’ quotes included performing this task. In addition, confirm that the contractor will remove and reinstall any type of gate or door to the new finished level of the paved driveway.